![]() |
|||||
|
![]()
Recent Construction Projects
SR 80 Guardrail Construction-Palm Beach County - FDOT This project involved the construction of 17 miles of new guardrail, post, panels, end anchorage assembly, rub rail, shop bent panels, flare and parallel ends. http://www.cbs12.com/news/name-4734056-sot-widom.html http://www.wptv.com/dpp/news/region_the_glades/state-road-80-guardrail-project-kicks-off-
49th Street Improvement-Pinellas County This project involved the construction of 2 miles of sidewalk reconstruction/intersection improvement, guardrails, drainage structures, milling and resurfacing, signalization and striping.
Hammerhead Construction-Collier County This new roadway extension project involved the reconstruction of 8 new T-Intersection to accommodate the three point turnaround of Solid Waste Collection trucks. Scope of work includes grading, earth work, lime rock, drainage, asphalt, concrete curbs and gutter.
Sidewalk Construction & Restoration-City of Tampa, Broward & Hillsborough County This project involved the reconstruction of existing and new sidewalks, driveways, drainage structures, ADA ramps, retaining walls and bus pads. http://alansnel.blogspot.com/2011/01/blog-post.html
Guardrail Construction-Broward County & FDOT This project involved the reconstruction of existing and new guardrails, post, panels and end anchorage assembly.
Davis Island Bike Path-City of Tampa This project involved the construction of 1.5 miles of new asphalt paved alignment bike path. Scope of work includes fencing, grading, earth work, lime rock, drainage, asphalt, ADA ramps, driveway, striping, concrete curbs and gutter.
New Path on Davis Islands part of city beautification project and many are already using it. (ABC Action News)
Transit Infrastructure and Shelter Improvement-Broward County Hillsborough Area Regional Transit (HART) & FDOT
This project involved the construction of new bus bays, bus pads and shelter throughout Broward County. Scope of work includes grading, earth work, lime rock, drainage, asphalt, ADA ramps, driveway, striping, concrete slab, curbs and gutter.
KB Home Design Studio and Office, Daytona Beach. This project involved the construction of KB Home Design studio and office space: build out of studio retail offices, including 2nd story 4,500sf mezzanine addition, new elevator, electrical with Douglas control panel, new fire alarms, FM-200 dry suppression fire sprinkler upgrades, and new bathroom facilities.
Deer Creek Entry sign/wall, Ormond Beach. This project involved the design and construction of 7 tier masonry entry sign and wall for Deer subdivision.
Plantation Bay Aluminum Bridge, Palm Coast. This project involved the construction of bolted aluminum bridge culvert for creek through development. Double barrel, 40’ wide, 300’ long and 150’ bridges with cast-in-place slab.
SR 441 Aluminum Bridge Culvert, Palm Beach. This project involved the construction of 90’ long, 30’ wide, aluminum bridge culvert, replacing single span flat slab bridge.
North Shore Aluminum Bridge Culvert, Orlando. This project involved the construction of double barrel, 60’ wide, 160’ long, aluminum bolted bridge with concrete headwalls and concrete decking.
Wal-Mart Bridge Culvert, North Port. This project involved the construction of 24’ wide, 120’ long, aluminum bolted bridge for retailer entrance with concrete decking.
I-95 at US1 and FEC Railroad Widening, Ormond Beach. This project involved the construction of widening of 4 AASHTO beam bridges on I-95, 600’ gravity wall, railroad riprap replacement. FDOT, District 5.
SR 100 Pedestrian Bridge, Flagler County. This project involved the installation of 40 timber piles for pedestrian bridge.
|
||||
![]() |